Home › Service Areas › Hinckley
Hinckley is the least suburban place we work. Lots run to acres rather than feet, the Metroparks reservation takes up a good part of the township, and the buildings match: detached garages, pole barns, workshops, equipment sheds. A floor here doesn't spend its life under two commuter cars. It carries a tractor, a zero-turn mower, an ATV, a welder in the corner and whatever's mid-project on jack stands — and that's a genuinely different specification.
What changes when the building is a workshop rather than a garage:
Every floor we install in Hinckley is built the same proven way — and finished in a single visit:
The finished floor is roughly 50 mil thick — slip-resistant, chemical-resistant, and easy to keep clean with a mop. It's backed by our 3-year workmanship warranty and built to last 15–20+ years.
Our rate is $6 per square foot for the full flake system, whatever the building:
Hinckley is inside our normal range from North Royalton — no rural travel surcharge. Barn slabs are often rougher than house garages, so we look before we price.
We install across Hinckley and the surrounding roads, including Ridge Road · Center Road · State Road · Bellus Road · Boston Road and beyond. If you're nearby and don't see your area, just ask.
Yes — that's what the full flake build is for. The wear on a workshop floor comes from turning equipment and dragged steel rather than tires, so abrasion resistance matters more than anything else. What we'd steer you away from is a thin roll-on coating, which will scar the first time you pivot a mower deck on it.
Yes, in the right months. The slab and the air both need to be at least 35°F for the coating to cure properly, and an unheated Hinckley barn in January isn't close to that — we book those for spring through autumn rather than promise something the material won't do. If the building has heat you can run for the day, that widens the window considerably. The other thing about an unheated building is that it moves more across the seasons, which is why joints get flexible polyurea rather than a rigid patch.
Above roughly 1,000 sq ft we'll usually plan two visits rather than rush it — and we'll tell you that when quoting, not at four in the afternoon with half a floor down. Doing it properly across two days beats a thin, hurried coat that fails in year three.
For barns and workshop floors: why unheated buildings need the right season · how big floors get scheduled.
Fixed price after a quick visit — most quotes within 24 hours.
Get Your Free Quote